Plan crack inducers from your floor plan

Upload a drawing and watch it become a structure. Scroll to build it.

Rebar and stop ends go in first

Nine pours, in order

The slab sets bay by bay, in the order of its pour days.

Walls rise around their inducers

A floor lands, with its grid

Up to ground level

See through the concrete

Drag to turn it. Pull the levels apart.

0crack inducers placed

Watch it work

Filmed in the configurator with a sample project. Prices are hidden.

Five steps from drawing to plan

A floor outline traced on the planThe parameters panel beside the planThe slab split into nine coloured pour areasCrack inducer lines across the floorThe structure in 3D with the ceilings hidden

Look inside the floor

Move or tap on the concrete. The steel and the crack inducers are underneath.

A breakdown report for procurement and construction

Every length is measured from the drawing and listed by product and structure.

Crack inducers, ceilings
1,548.25 m
Crack inducers, walls
357.90 m
Concrete sealer, walls
444.49 m
Concrete sealer, ceilings
444.49 m
Concrete sealer, slab
222.24 m
Stop end profiles
350.95 m

Selected quantities from the sample project shown above. Heights in the 3D model are enlarged so the walls read clearly.

Real thickness, real steel

A 2.4 by 1.6 m section, drawn to scale. Not a structural design.

The whole job on one board

All features

Pour days

Each area gets its own day. Day 9 of 9

Render of a lift shaft cut open across three storeys

Lift shafts

They run through every floor.

Render of four layers of ribbed rebar leaving a concrete slab

Four rebar layers

Diameter and spacing for each one.

Planned here, made by Primostar

PrimostarCutaway of a slab with rebar and a crack inducer profile, marked patent pending

Primostar crack inducer

Decides where the concrete cracks.

PrimostarCutaway of a wall and slab joint with a metal sheet waterstop between the rebar

Primostar metal sheet waterstop

Sits in the joint between slab and wall.

How it decides

What drawing do I need?

An image or a PDF of the floor plan. Mark one known length and everything after that is measured in metres.

How does it decide where crack inducers go?

It looks at each pour area: the length of its sides, their ratio, and an R factor worked out from your concrete, rebar and casting conditions. Then it places the lines, starting from the centre.

When does an area have to be divided?

In a slab, no cell may be 25 m or longer. In a ceiling the limit is 10 m. The long side divided by the short side also has to stay within the R factor.

How far apart are the inducers in a wall?

At most 4.5 m, or 1.8 times the wall height when that is less.

What changes the R factor?

Thickness, rebar diameter and spacing in each of four layers, concrete class, water to cement ratio, extra cement, casting temperature, heating cables and curing.

Can I overrule the result?

Yes. Slide an inducer, draw your own or erase one. Undo takes you back.

How are lift shafts handled?

Place one on the plan, set its size and rotation, and it runs through every floor in 3D.

Start with your drawing

Open the configuratorRequest a quote