Set every bar and every pour
Pick a structure and change it. Steel and concrete follow.
A 2.4 by 1.6 m section, drawn to scale.
Draw straight on your plan
What you can enter
- Slab thickness
- 150 to 1500 mm
- Wall thickness
- 150 to 500 mm
- Ceiling thickness
- 200 to 500 mm
- Wall height
- up to 10 m
- Concrete
- C20/25 to C40/50
- Rebar diameter
- Ø8 to Ø25 mm
- Rebar spacing
- 50 to 200 mm
- Rebar layers
- 4 per structure
- Casting temperature
- 6 to 25 °C
- Water to cement
- 0.30 to 0.70
- Pour days
- 1 to 10
- Formwork stripping
- 24 or 48 h
Print it, send it
- PDF report with one floor drawing per level
- Undo and redo while you draw
- Copy a project and try another version
- Lock a project so it is view only
- English and Estonian